Server
Operations
35
Installing the Access Panel
1. Place the access panel on top of the server with the hood latch open. Allow
the panel to extend past the rear of the server approximately 1.25 cm (0.5 in).
2. Push down on the hood latch. The access panel slides to a closed position.
Installing the PCI Riser Cage
CAUTION: To prevent damage to the server or expansion
boards, power down the server and remove all AC power cords before
removing or installing the PCI riser cage.
1. Align the PCI riser cage with the chassis and slide it into place.
2. Tighten the thumbscrews to secure the PCI riser cage:
a. Lift the thumbscrew knobs (1).
b. Turn the thumbscrews clockwise while pressing down, until tightened
(2).